Mould steel quenchs analysis of 10 kinds of crackle and measure
- Time:
- Click:159
01-1.
5mm, submit radiation form, alias chap. The reason basically has: (1) raw material has deeper decarburized layer, cold cutting is machined not purify, or finished product mould heats in oxidation atmosphere furnace cause oxidation decarbonization; (Organization of metal of surface layer of 2) mould decarbonization and steel matrix martensite contain carbolic quantity to differ, specific volume is different, the generation when steel decarbonization surface layer quenchs pulls stress greatly, accordingly, surface layer metal often edge crystal boundary by rip reticulate; (3) raw material is thick grain steel, primitive organization is bulky, put in chunk shape ferrite, convention quenchs cannot eliminate, reservation is in quench in the organization, or accuse lukewarm forbid, appearance is out of order, produce constituent overheat, burn too even, grain is thick change, lose crystal boundary adhesion, the mould quenchs the separate out of crystal boundary of carbide edge austenite of the steel when refrigeration, crystal boundary intensity is reduced greatly, tenacity is poor, brittleness is big, in pull crystal boundary of the edge below stress action to show meshy crack. Precautionary measures: (Composition of chemistry of 1) strict raw material. Metallographic organization and flaw detection are checked, unqualified raw material and thick grain steel should not be mould material; (2) chooses electric steel of fine grain steel, vacuum, deepness of raw material decarburized layer checks before put into production, cold cutting mental allowance must be more than decarburized layer deepness; (3) formulate is advanced and reasonable heat treatment craft, choose personal computer to charge lukewarm meter, control precision achieves ± 1.
5 ℃ , appearance of time spot desired result; (Final processing chooses 4) mould product furnace of atmosphere of vacuum electric stove, protection and heat via bath furnace of salt of sufficient to oxigenate the measure such as mould product, prevent effectively and avoid meshy crackle to form. 6, steel of mould of cold treatment crackle is more in, tall carbon alloy steel, there still is partial super-cooling austenite to did not transform after quenching martensite, reservation becomes leftover austenite in use condition, influence performance characteristics. If continue to cool under park zero, can make leftover austenite produce martensite change, accordingly, the essence of cold treatment is to quench continue. Quench below room temperature below stress and zero stress overlay, cold treatment crackle is formed when should folding response force to exceed limit of this data strength. Precautionary measures: (Before the cold treatment after 1) quenchs will boil in mould park boiling water 30, 60min, can eliminate 15 % - 25 % quench internal stress makes leftover austenite stability is changed, reentry goes - cold treatment of 60 ℃ convention, or undertake - 120 ℃ deep cold treatment, temperature heals low, leftover austenite change heals into martensite quantity much, but cannot total change is over, the experiment makes clear, have 2 % about - reservation of 5 % leftover austenite comes down, by need reservation a few leftover austenite can slacken stress, have amortize effect, because of leftover austenite soft pliable but strong, can absorb martensite to change partly expand quickly energy, alleviation photograph changes stress; (In the mould is being taken out to throw hot water after 2) cold treatment ends, warm up, can eliminate 40 % - stress of 60 % cold treatment, warm up to answer to room temperature hind seasonable temper, cold treatment stress is eliminated further, avoid cold treatment crackle to form, acquire firm methodize property, ensure to distortion does not produce in mould product is deposited and be being used. 7, grinding crackle often happens in mould finished product to quench, in process of cold working of the grinding after temper, the tiny flaw that majority forms and grinding direction are perpendicular, make an appointment with greatly 0.
05, 1.
0mm. (Pretreatment of 1) raw material is undeserved, fail to remove raw material adequately lump, meshy, banding carbide and produce serious decarbonization; (2) quenchs finally heat temperature is exorbitant, produce overheat, grain is bulky, generate more leftover austenite; (3) produces stress to cause when grinding change, make leftover austenite change is martensite, constituent stress is great, add, stay more remains pulls stress, organize stress overlay with grinding, or reach refrigeration greatly because of quantity of grinding speed, feed undeserved, bring about heat of grinding of metallic surface layer to warm up quickly to quench heat temperature, subsequently grinding fluid is cooling, cause grinding surface layer 2 times to quench, a variety of stress are integrated, exceed limit of this data strength, cause crackle of grinding of surface layer metal. Precautionary measures: (1) undertakes changing forge to raw material, for many times double crossed deformation unplugs to Dui forging, via 4 Dui 4 unplug, make forging fibre around model antrum or axes show waviness semmetry to distributing, use last fire high temperature more than heat undertakes quenching, catch high temperature temper, can eliminate adequately lump, meshy, banding with chain certificate carbide, make carbide is refined to 2-3 class; (The heat treatment technology with 2) advanced formulate, control quenchs leftover austenite content does not exceed bid finally; (After 3) quenchs have temper in time, eliminate quench stress; (4) reduces amount of grinding speed, grinding appropriately, grinding cooling rate, can prevent effectively and avoid grinding crackle to form. 8, this crackle gives line cut crackle to quench in the course now, online cut machines the module of temper in the process, this process changed metallic surface layer, intermediate layer and core stress field to distributing condition, quench overbalance of leftover internal stress is out of shape, some area appears to pull stress greatly, this pulls stress to work energetically scamper is brought about to crack when limit of strength of this mould data, crackle is crackle of layer of metamorphism of bold of arc end account. The experiment makes clear, line cut process is discharge of local high temperature and quick cooling procedure, make metallic surface layer forms dendritic casting condition to organize caky layer, generation 600-900MPa is pulled stress and thick about 0. The tall stress of 03mm quenchs 2 times white bright layer. Crackle produces an account: (The carbide with serious existence of 1) raw material slants analyse; (2) appearance is out of order, quench heat temperature is exorbitant, grain is bulky, reduce material obdurability, increase brittleness; (3) quenchs not seasonable temper mixes workpiece temper is inadequate, the leftover internal stress with too large presence and the overlay of new internal stress that the line forms in cut process bring about line cut crackle. Precautionary measures: (1) is checked before put in storage of strict raw material, ensure raw material organizes composition qualification, must undertake changing forge to unqualified raw material, attack broken carbide, make chemical composition, metallographic is organized etc obtain technical condition rear but put into production. Finished product of the treatment before module heat treatment needs to stay sufficient after grinding a quantity certainly, quench. Cut of temper, line; (2) enters appearance of the desired result before furnace, choose personal computer to accuse lukewarm, accuse lukewarm precision ± 1.
5 ℃ , vacuum furnace, protective atmosphere furnace heats, take strict precautions against overheat and oxidation decarbonization; (3) is used classification quench, after isotherm quenchs and quenching seasonable temper, for many times temper, eliminate internal stress adequately, the cut that it is a line creates a condition; (4) formulate science is reasonable line cut craft. 9, when fatigue fracture mould enlists in army, handing in change the microscopical and fatigue crackle that stress forms below action repeatedly is slow and patulous, bring about abrupt fatigue fracture. (Grain of hair of existence of 1) raw material, slant badly from dot, hole, loose, metalloid be mingled with, carbide metallurgy of ferrite of dissociate of analyse, banded structure, lump organizes blemish, destroyed matrix the organization is successional, form inhomogenous stress concentration. In steel ingot 112 did not eliminate, white spot is formed when bringing about rolling. *** , Bi, Pb, Sn, As and S, P exists to wait for harmful impurity in steel, the P in steel is easy cause cold short, and S is easy cause heat fragile, s, p harmful impurity exceeds bid all easy form fatigue source; (Heavy panel of layer of 2) chemical ooze, chroma crosses layer of big, ooze excessive, sclerotic layer crosses hardness of shallow, intermediate zone low can bring about material exhaustion intensity is reduced quickly; (3) machines coarse, precision when modular face low, bright and clean spend difference, and Dao Wen, carve characters on a seal, nick, touch, corrode hemp face to wait to cause stress easily also to bring about fatigue fracture centrally. Precautionary measures: (1) strict select material, ensure material is qualitative, metalloid matter content of the impurity of low melting point such as control Pb, As, Sn and S, P does not exceed bid; (2) undertakes material is checked character before put into production, unqualified raw material not put into production; (3) choosing appliance has chasteness to spend tall, impurity little, chemical composition even, grain is fine. Carbide it is small, good to wait for tropism, fatigue intensity is advanced the steel-making of essence of remelting of electric broken bits of the characteristic, aggrandizement of modified of layer of chemical to aggrandizement of bolus of gush of mould face face and surface ooze is handled, make metallic surface layer is press stress beforehand, of the generation when quits mould enlists in army pull stress, increase strength of mould face exhaustion; (4) raises mould face to machine precision and bright and clean degree; (5) improves chemical ooze layer and performance of sclerotic layer organization; Use personal computer to control ply of chemical ooze layer, chroma and sclerotic layer ply. 10, stress corrodes crackle this crackle often happens in use process. Because metallic mould is chemical reaction or electrochemistry reaction process, cause come from the watch inside constituent structure attaint corrodes action and produce craze, this is stress corrodes crackle. Mould steel differs because of the organization after heat treatment, the function that fight corrode is different also. Most be able to bear or endure corrode organization is austenite (A) , corrode an organization the most easily to be troostite (T) , ordinal for ferrite (one martensite of F) (one pearlite of M) (P) alls alone family name body (S) . Accordingly, mould steel heat treatment is unfavorable get T is organized. Quench steel although classics temper, but because temper is inadequate, quench internal stress still exists more or less, when the mould enlists in army, outer strength effect falls to also can produce new stress, every has metal of stress consist in there can be stress to corrode crackle happening in the mould. Precautionary measures: (Seasonable temper answers after 1) mould steel quenchs, sufficient temper, for many times temper, quench in order to eliminate internal stress; (After 2) mould steel quenchs, should not be commonly in 350-400~C temper, because T is organized,often appear in this temperature, happen T organizes a mould to answer retexture, the mould should undertake antirust processing, improve the performance that fight corrode; (Microtherm warm-up undertakes before 3) heats up a mould to enlist in army, leng Zunmo is provided enlist in army microtherm temper makes eliminate stress after a phase, can prevent not only and avoid stress to corrode crackle happening, still can improve mould service life substantially, kill two birds with one stone, have remarkable technology economic benefits. CNC Milling